• Chinese, Simplified Chinese, Simplified
  • English English
  • Spanish Spanish
  • ABOUT
  • CODES
  • CREATE
1Pre-Code
2Attention Directing
3Action
4Difficult Situations
5Response
6 Interaction
7Information
8Youth Code
9Meetings
10Mood
11Constructed
12Connection
13Relationship
14Disengagement
15Negotiation
16Assessment
17Project Status
18Travel
2/7

What are the priorities? Which things matter the most? What is really important here? Which things have to come first?

Code 2/7 corresponds to the FIP tool on the CoRT programmes: First Important Priorities.
Many of the attention-directing tools can produce a long list of items. For example code 2/3 can produce a long list of factors to be considered. Code 2/2 may produce a long list of possible consequences. There is a need to recognize that not all the items on these long lists are equally important. So code 2/7 is a request to select the most important items from a list

  • Add new comment
 

CLICK TO WATCH

User login

  • Create new account
  • Request new password
de bono media

Copyright

Copyright © 2012 de Bono Media
All Rights Reserved
do it media